News
Company news
28.07.2018
Specialists of the company Barrus Projects successfully completed transportation of one of the most critical cargoes (CO2 stripper) weighing 269 tons, with dimensions: 52 540 mm x 7 100 mm x 7 490 mm addressed to NavoiAzot JSC.
08.06.2018
Specialists of the company Barrus Projects successfully completed transportation of one of the most critical cargoes (Ammonia Synthesis Column) weighing 422 tons, with dimensions: 27,780 mm x 4,290 mm x 5000 mm addressed to NavoiAzot JSC.
28.03.2018
Specialists of the company Barrus Projects successfully completed transporta-tion of one of the most critical cargoes (Auxiliary Boiler) weighing 240 tons, with dimensions: 12,700 mm x 8,700 mm x 10,720 mm addressed to NavoiAzot JSC.
Industry news
15.10.2018
Global warming is causing the melting of ice in the Arctic ocean, and areas previously difficult to navigate, are gradually opening up for shipping.