Nuclear Power Solutions

One of the success factors in construction is safe and timely delivery of the main equipment with long manufacturing cycle at the construction site, which eliminates failures in the construction schedule and huge financial losses.

Since the basic equipment (steam generators, reactor vessels, transformers) is often super heavy and oversized, and construction sites usually do not have well-developed transport infrastructure – cooperation with a specialized project logistics company, which has the necessary engineering resources and specialized transport equipment, is a key factor for the success of any project.

  • General cargo
  • Melt localization devices
  • Steam generators
  • Transformers
  • Reactor vessels
Case studies