CASE STUDIES
Delivery of the blades directly from the VESTAS manufacturing plant in Ulyanovsk to the Kotovo wind farm. The nacelles came from the port of Saratov, where they were unloaded from the barge, placed in a temporary storage warehouse and then transported to the Kotovo wind farm.
Ñargo:
Autoclave 50 x 6m / 1100t
Equipment:
Synthesis unit, Main evaporator casing, Economizer casing, Shield evaporator and superheater casing, Thermal oxidizer, Flue gas duct
Equipment:
Press
Equipment:
Depropanizer column, debutanizer column, flare ko drums, feed gas drying adsorber, mercury removal adsorber